ITAC Assessment: AR0001
ITAC logo
ITAC Assessment: AR0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Wood Furniture
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 250,000
ft2
Annual Production 13,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,655 3,578,839
kWh
Natural Gas $6,045 1,481
MMBtu
LPG $25,021 13,824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,172 $200 $5,172
65,651
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,336 $620 $13,336
169,402
kWh
03 2.4133: Use most efficient type of electric motors $14,158 $21,800 $14,158
179,660
kWh
04 2.4221: Install compressor air intakes in coolest locations $680 $70 $680
7,620
kWh
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,028 $3,400 $11,028
-
kWh
06 2.3321: Use steam pressure reduction to generate power $33,492 $25,300 $33,492
-
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,591 $227 $1,591
20,223
kWh
TOTAL RECOMMENDED $79,457 $51,617 $79,457
442,556
kWh
TOTAL IMPLEMENTED $68,429 $48,217 $68,429
442,556
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs