Assessment Year | 1993 |
---|---|
Principal Product | Wood Furniture |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
250,000
ft2
|
Annual Production | 13,000
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $281,655 | 3,578,839 |
kWh
|
$0.079 |
Natural Gas | $6,045 | 1,481 |
MMBtu
|
$4.08 |
LPG | $25,021 | 13,824 |
MMBtu
|
$1.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $68,429 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $5,172 | $200 |
$5,172
65,651
kWh
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,336 | $620 |
$13,336
169,402
kWh
|
|
03 | 2.4133: Use most efficient type of electric motors | $14,158 | $21,800 |
$14,158
179,660
kWh
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $680 | $70 |
$680
7,620
kWh
|
|
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,028 | $3,400 |
$11,028
-
kWh
|
|
06 | 2.3321: Use steam pressure reduction to generate power | $33,492 | $25,300 |
$33,492
-
kWh
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,591 | $227 |
$1,591
20,223
kWh
|
|
TOTAL RECOMMENDED | $79,457 | $51,617 |
$79,457
442,556
kWh
|
||
TOTAL IMPLEMENTED | $68,429 | $48,217 |
$68,429
442,556
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs