ITAC Assessment: GT0758
ITAC logo
ITAC Assessment: GT0758
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product DECORATIVE PAPER
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2754: Commercial Printing, Gravure
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 200,000
ft2
Annual Production 196,850
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $590,434 11,063,308
kWh
Natural Gas $363,464 88,715
MMBtu
Fuel Oil #2 $9,560 1,177
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,026 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,720 $47,268 $20,720
388,020
kWh
- - -
02 2.7492: Use proper thickness of insulation on building envelope $9,072 $12,000 $9,072
73,742
kWh
- - -
03 2.7111: Reduce illumination to minimum necessary levels $1,895 $47,736 n/a $1,895
35,496
kWh
- - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $14,438 $31,350 n/a $14,438
401,600
kWh
- - -
05 2.3132: Recharge batteries on during off-peak demand periods $322 - - $322
-
kW-mo/yr
- -
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $28,386 $12,140 n/a $28,386
789,557
kWh
- - -
07 2.2414: Use waste heat from hot flue gases to preheat $6,773 $6,150 - - $6,773
-
MMBtu
-
08 3.4116: Meter recycled water (to reduce sewer charges) $23,420 $1,850 - - - $23,420
-
Tgal
TOTAL RECOMMENDED $105,026 $158,494 $74,511
1,688,415
kWh
$322
-
kW-mo/yr
$6,773
-
MMBtu
$23,420
-
Tgal
TOTAL IMPLEMENTED $53,534 $61,118 $29,792
461,762
kWh
$322
-
kW-mo/yr
- $23,420
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs