ITAC Assessment: LM0057
ITAC logo
ITAC Assessment: LM0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product four color large format printing
NAICS 313210: Broadwoven Fabric Mills
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 51
Plant Area 33,000
ft2
Annual Production 3,021,000
lb
Production Hrs. Annual 4,576
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,633 1,089,324
kWh
Electricity Demand $55,378 10,680
kW-mo/yr
Electricity Fees $2,769 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,369 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $191,369

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $543 $1,430 $482
8,829
kWh
$61
-
kW-mo/yr
- -
02 2.7131: Add area lighting switches $2,375 $3,580 $1,881
36,260
kWh
$494
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $568 $140 $450
8,694
kWh
$118
-
kW-mo/yr
- -
04 4.513: Re-arrange equipment layout to reduce labor costs $140,025 $42,126 - - $140,025 -
05 4.431: Train operators for maximum operating efficiency $47,858 $12,520 - - - $47,858
TOTAL RECOMMENDED $191,369 $59,796 $2,813
53,783
kWh
$673
-
kW-mo/yr
$140,025 $47,858
TOTAL IMPLEMENTED $191,369 $59,796 $2,813
53,783
kWh
$673
-
kW-mo/yr
$140,025 $47,858
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs