Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Newspapers: publishing, or publishing and printing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0181 #05 Y:2003 Utilize controls to operate equipment only when needed $15,188 $1,545
SU0181 #04 Y:2003 Install compressor air intakes in coolest locations $4,821 $264
SU0181 #03 Y:2003 Make a practice of turning off lights when not needed $1,560 -
SU0181 #02 Y:2003 Make a practice of turning off lights when not needed $8,932 -
SU0181 #01 Y:2003 Reduce the pressure of compressed air to the minimum required $11,244 -
SU0179 #05 Y:2003 Optimize plant power factor $3,469 $6,227
SU0179 #04 Y:2003 Install compressor air intakes in coolest locations $1,671 $2,665
SU0179 #03 Y:2003 Utilize higher efficiency lamps and/or ballasts $8,108 $6,327
SU0179 #02 Y:2003 Reduce illumination to minimum necessary levels $543 -
SU0179 #01 Y:2003 Change rate schedules or other changes in utility service $12,807 -
SU0167 #06 Y:2003 Recover waste heat from equipment $6,319 $5,775
SU0167 #05 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $603 $116
SU0167 #04 Y:2003 Install compressor air intakes in coolest locations $1,750 $214
SU0167 #03 Y:2003 De-energize excess transformer capacity $8,152 $147
SU0167 #02 Y:2003 Reduce illumination to minimum necessary levels $633 -
SU0167 #01 Y:2003 Turn off equipment when not in use $839 -
HO0233 #22 Y:2000 Reduce scrap production $53,000 $1,000
HO0233 #21 Y:2000 Reuse / recycle/ sell paper products $22,500 $1,000
HO0233 #20 Y:2000 Change procedures / equipment / operating conditions $53,000 $1,000
HO0233 #19 Y:2000 Improve handling practices $3,720 $500