ITAC Assessment: SU0167
ITAC logo
ITAC Assessment: SU0167
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Newspapers
NAICS 511110: Newspaper Publishers
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 71,606
ft2
Annual Production 1,835,600
pieces
Production Hrs. Annual 8,763
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,762 1,499,544
kWh
Electricity Demand $76,107 5,084
kW-mo/yr
Electricity Fees $24,212 -
Natural Gas $21,976 2,681
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $839 - - - $839
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $633 - $633
2,771
kWh
- -
03 2.3512: De-energize excess transformer capacity $8,152 $147 $8,152
103,192
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $1,750 $214 $1,142
14,452
kWh
$608
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $603 $116 $603
7,633
kWh
- -
06 2.2437: Recover waste heat from equipment $6,319 $5,775 - - $6,319
-
MMBtu
TOTAL RECOMMENDED $18,296 $6,252 $10,530
128,048
kWh
$608
-
kW-mo/yr
$7,158
-
MMBtu
TOTAL IMPLEMENTED $839 - - - $839
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs