Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,080

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Newspapers: publishing, or publishing and printing
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0894 #07 Y:2023 Install occupancy sensors $110 $55
AM0894 #06 Y:2023 Use synthetic lubricant $150 $100
AM0894 #05 Y:2023 Utilize daylight whenever possible in lieu of artificial light $335 -
AM0894 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $420 $7
AM0894 #03 Y:2023 Replace fossil fuel equipment with electrical equipment $670 $790
AM0894 #02 Y:2023 Lower light fixtures in high ceiling areas $735 $1,300
AM0894 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,035 $500
OR0674 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,953 -
OR0674 #02 Y:2016 Use waste heat from hot flue gases to preheat $5,376 $4,258
OR0674 #01 Y:2016 Reduce the pressure of compressed air to the minimum required $5,868 -
AM0695 #08 Y:2015 Install occupancy sensors $150 $170
AM0695 #07 Y:2015 Apply for tax-free status for energy purchases $1,350 $540
AM0695 #06 Y:2015 Reduce the pressure of compressed air to the minimum required $390 $4
AM0695 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $800 $200
AM0695 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $875 $520
AM0695 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,170 $1,660
AM0695 #02 Y:2015 Apply for tax-free status for energy purchases $9,660 -
AM0695 #01 Y:2015 Optimize plant power factor $9,060 $12,550
MI0276 #13 Y:2015 Make a practice of turning off lights when not needed $831 $20
MI0276 #12 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,078 $1,638