Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Newspaper
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0828 #18 Y:2010 Recover waste heat from equipment $3,601 $25
UD0828 #17 Y:2010 Install fossil fuel make-up air unit $15,589 $35,000
UD0828 #16 Y:2010 Recover waste heat from equipment $52,035 $62,500
UD0828 #15 Y:2010 Modify refrigeration system to operate at a lower pressure $990 $250
UD0828 #14 Y:2010 Modify refrigeration system to operate at a lower pressure $11,308 $25
UD0828 #13 Y:2010 Use cooling tower water instead of refrigeration $16,653 $25
UD0828 #12 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $6,066 $5,000
UD0828 #11 Y:2010 Use adjustable frequency drive or multiple speed motors on existing system $13,598 $500
UD0828 #10 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $2,710 $500
UD0828 #09 Y:2010 Upgrade controls on compressors $6,407 $2,100
UD0828 #08 Y:2010 Turn off equipment when not in use $4,272 $14,000
UD0828 #07 Y:2010 Utilize energy-efficient belts and other improved mechanisms $6,431 $1,200
UD0828 #06 Y:2010 Use most efficient type of electric motors $17,796 $62,106
UD0828 #05 Y:2010 Turn off equipment when not in use $28,346 $12,800
UD0828 #04 Y:2010 Ventilation system to shut off when room is not in use $86,333 $28,000
UD0828 #03 Y:2010 Install occupancy sensors $2,693 $2,405
UD0828 #02 Y:2010 Disconnect ballasts $4,524 $550
UD0828 #01 Y:2010 Change rate schedules or other changes in utility service $2,599 $2,599
UD0800 #10 Y:2009 Reduce the pressure of compressed air to the minimum required $162 $250
UD0800 #09 Y:2009 Meter recycled water (to reduce sewer charges) $330 $300