Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

255

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Uncoated paper and multiwall bags
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2004 #05 Y:2019 Utilize higher efficiency lamps and/or ballasts $20,227 -
LS2004 #04 Y:2019 Install occupancy sensors $10,389 $3,245
LS2004 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $2,899 -
LS2004 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $1,091 $25
LS2004 #01 Y:2019 Install timers and/or thermostats $2,617 -
BD0432 #07 Y:2013 Reduce the pressure of compressed air to the minimum required $378 $20
BD0432 #06 Y:2013 Shut off pilots in standby equipment $212 $40
BD0432 #05 Y:2013 Utilize higher efficiency lamps and/or ballasts $793 $2,777
BD0432 #04 Y:2013 Install compressor air intakes in coolest locations $1,312 $500
BD0432 #03 Y:2013 Use most efficient type of electric motors $1,832 $4,800
BD0432 #02 Y:2013 Adjust / maintain fork lift trucks for most efficient operation $6,185 $16,000
BD0432 #01 Y:2013 Use radiant heater for spot heating $9,498 $14,512
SD0459 #05 Y:2012 Use minimum steam operating pressure $276 $200
SD0459 #04 Y:2012 Install occupancy sensors $1,059 $845
SD0459 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $2,717 $200
SD0459 #02 Y:2012 Use photocell controls $4,256 $7,400
SD0459 #01 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $18,564 $2,200
GT0886 #05 Y:2011 Replace hydraulic / pneumatic equipment with electric equipment $24,782 $14,000
GT0886 #04 Y:2011 Upgrade controls on compressors $51,129 $25,000
GT0886 #03 Y:2011 Develop a repair/replace policy $3,617 $9,994