ITAC Assessment: GT0886
ITAC logo
ITAC Assessment: GT0886
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Multi-wall bags
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 300,000
ft2
Annual Production 24,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,190 5,324,822
kWh
Electricity Demand $169,213 10,716
kW-mo/yr
Electricity Fees $29,400 -
Natural Gas $91,242 9,041
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,217 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,057

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $30,160 $2,400 - - - $30,160
02 3.4155: Meter waste water $5,529 $2,500 - - $5,529
-
Tgal
-
03 2.4151: Develop a repair/replace policy $3,617 $9,994 $1,826
31,110
kWh
$1,791
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $51,129 $25,000 $34,072
580,440
kWh
$17,057
-
kW-mo/yr
- -
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $24,782 $14,000 $13,888
236,590
kWh
$10,894
-
kW-mo/yr
- -
TOTAL RECOMMENDED $115,217 $53,894 $49,786
848,140
kWh
$29,742
-
kW-mo/yr
$5,529
-
Tgal
$30,160
TOTAL IMPLEMENTED $85,057 $51,494 $49,786
848,140
kWh
$29,742
-
kW-mo/yr
$5,529
-
Tgal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs