ITAC Assessment: SD0459
ITAC logo
ITAC Assessment: SD0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Paper Bags
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 140,000
ft2
Annual Production 703,000,000
pieces
Production Hrs. Annual 6,480
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,009 2,154,350
kWh
Electricity Demand $74,252 4,709
kW-mo/yr
Electricity Fees $(-46,463.0) -
Natural Gas $5,888 771
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,564 $2,200 $11,813
231,173
kWh
$6,751
-
kW-mo/yr
-
02 2.7134: Use photocell controls $4,256 $7,400 $1,861
36,434
kWh
$2,395
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,717 $200 $2,717
53,170
kWh
- -
04 2.7135: Install occupancy sensors $1,059 $845 $1,059
20,715
kWh
- -
05 2.2163: Use minimum steam operating pressure $276 $200 - - $276
-
MMBtu
TOTAL RECOMMENDED $26,872 $10,845 $17,450
341,492
kWh
$9,146
-
kW-mo/yr
$276
-
MMBtu
TOTAL IMPLEMENTED $18,840 $2,400 $11,813
231,173
kWh
$6,751
-
kW-mo/yr
$276
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs