Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics, foil, and coated paper bags
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0477 #08 Y:2015 Use most efficient type of electric motors $744 $2,450
BD0477 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $971 $800
BD0477 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $1,182 $1,000
BD0477 #05 Y:2015 Reduce the pressure of compressed air to the minimum required $2,507 $20
BD0477 #04 Y:2015 Install compressor air intakes in coolest locations $3,131 $500
BD0477 #03 Y:2015 Use radiant heater for spot heating $8,451 $20,000
BD0477 #02 Y:2015 Adjust / maintain fork lift trucks for most efficient operation $12,472 $8,000
BD0477 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $16,854 $42,330
BD0468 #10 Y:2015 Utilize higher efficiency lamps and/or ballasts $268 $119
BD0468 #09 Y:2015 Utilize higher efficiency lamps and/or ballasts $326 $275
BD0468 #08 Y:2015 Install occupancy sensors $971 $1,050
BD0468 #07 Y:2015 Use power during off-peak periods $539 $20
BD0468 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $778 $1,230
BD0468 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $792 $450
BD0468 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $857 $2,096
BD0468 #03 Y:2015 Use radiant heater for spot heating $12,081 $30,000
BD0468 #02 Y:2015 Adjust / maintain fork lift trucks for most efficient operation $22,812 $4,180
BD0468 #01 Y:2015 Replace dc equipment with ac equipment $109,964 $421,778
BD0449 #10 Y:2014 Install compressor air intakes in coolest locations $407 $700
BD0449 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $739 $600