Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Corrugated and solid fiber boxes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0452 #06 Y:2003 Use optimum temperature $5,420 $7,880
OR0452 #05 Y:2003 Upgrade controls on compressors $3,600 $4,000
OR0452 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $900 $900
OR0452 #03 Y:2003 Turn off equipment when not in use $2,335 $4,025
OR0452 #02 Y:2003 Use most efficient type of electric motors $6,280 $7,540
OR0452 #01 Y:2003 Develop standard operating procedures $106,000 -
OR0298 #07 Y:1997 Optimize plant power factor $1,350 $3,375
OR0298 #06 Y:1997 Convert combustion equipment to burn natural gas $10,600 $81,640
OR0298 #05 Y:1997 Replace city water with recycled water via cooling tower $17,480 $2,870
OR0298 #04 Y:1997 Use or replace with energy efficient substitutes $3,760 $18,000
OR0298 #03 Y:1997 Utilize energy-efficient belts and other improved mechanisms $2,504 $7,050
OR0298 #02 Y:1997 Use most efficient type of electric motors $7,037 $9,611
OR0298 #01 Y:1997 Analyze flue gas for proper air/fuel ratio $1,780 $500
OR0050 #09 Y:1989 Optimize plant power factor $890 $2,250
OR0050 #08 Y:1989 Install / repair insulation on steam lines $379 $300
OR0050 #07 Y:1989 Install / repair insulation on condensate lines $244 $267
OR0050 #06 Y:1989 Use most efficient type of electric motors $198 $76
OR0050 #05 Y:1989 Utilize higher efficiency lamps and/or ballasts $1,538 $546
OR0050 #04 Y:1989 Use waste heat from hot flue gases to preheat $1,554 $650
OR0050 #03 Y:1989 Install compressor air intakes in coolest locations $835 $250