ITAC Assessment: OR0050
ITAC logo
ITAC Assessment: OR0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area
n/a
Annual Production 600,000
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,282 3,463,658
kWh
Natural Gas $90,182 37,598
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $5,268 $500 - $5,268
-
MMBtu
-
02 2.2511: Insulate bare equipment $1,546 $378 - $1,546
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $835 $250 $835
17,292
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $1,554 $650 - $1,554
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,538 $546 $1,380
28,722
kWh
- $158
06 2.4133: Use most efficient type of electric motors $198 $76 $198
4,103
kWh
- -
07 2.2122: Install / repair insulation on condensate lines $244 $267 - $244
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $379 $300 - $379
-
MMBtu
-
09 2.3212: Optimize plant power factor $890 $2,250 $890
-
kWh
- -
TOTAL RECOMMENDED $12,452 $5,217 $3,303
50,117
kWh
$8,991
-
MMBtu
$158
TOTAL IMPLEMENTED $8,218 $1,672 $2,413
50,117
kWh
$5,647
-
MMBtu
$158
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs