Assessment Year | 1989 |
---|---|
Principal Product | CORRUGATED BOXES |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 109 |
Plant Area |
n/a
|
Annual Production | 600,000
thousand feet
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,282 | 3,463,658 |
kWh
|
$0.048 |
Natural Gas | $90,182 | 37,598 |
MMBtu
|
$2.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,452 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,218 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,268 | $500 | - |
$5,268
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $1,546 | $378 | - |
$1,546
-
MMBtu
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $835 | $250 |
$835
17,292
kWh
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $1,554 | $650 | - |
$1,554
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,538 | $546 |
$1,380
28,722
kWh
|
- | $158 | |
06 | 2.4133: Use most efficient type of electric motors | $198 | $76 |
$198
4,103
kWh
|
- | - | |
07 | 2.2122: Install / repair insulation on condensate lines | $244 | $267 | - |
$244
-
MMBtu
|
- | |
08 | 2.2136: Install / repair insulation on steam lines | $379 | $300 | - |
$379
-
MMBtu
|
- | |
09 | 2.3212: Optimize plant power factor | $890 | $2,250 |
$890
-
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,452 | $5,217 |
$3,303
50,117
kWh
|
$8,991
-
MMBtu
|
$158 | ||
TOTAL IMPLEMENTED | $8,218 | $1,672 |
$2,413
50,117
kWh
|
$5,647
-
MMBtu
|
$158 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs