ITAC Assessment: GT0788
ITAC logo
ITAC Assessment: GT0788
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product METAL DOORS
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 136,630
ft2
Annual Production 40,700
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,717 2,660,445
kWh
Electricity Demand $40,435 10,990
kW-mo/yr
Electricity Fees $12,009 -
Natural Gas $46,144 4,812
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,302 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,212

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8118: Check for accuracy of utility / power meters $7,899 - - - - - $7,899
02 2.8112: Combine utility meters $16,373 - - - - $16,373 -
03 2.2514: Cover open tanks $4,940 $3,185 - - $4,940
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $13,315 $31,400 $1,419
24,800
kWh
$1,181
-
kW-mo/yr
$10,715
-
MMBtu
- -
05 2.7229: Air condition only space necessary $8,123 $3,450 - - $8,123
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,890 - $3,410
59,531
kWh
$1,480
-
kW-mo/yr
- - -
07 2.2511: Insulate bare equipment $144 $1,100 $102
1,750
kWh
$42
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,396 $3,768 $1,672
29,200
kWh
$724
-
kW-mo/yr
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $760 $1,200 $530
9,324
kWh
$230
-
kW-mo/yr
- - -
10 2.6231: Utilize controls to operate equipment only when needed $3,462 $1,000 $3,462
60,480
kWh
- - - -
TOTAL RECOMMENDED $62,302 $45,103 $10,595
185,085
kWh
$3,657
-
kW-mo/yr
$23,778
-
MMBtu
$16,373 $7,899
TOTAL IMPLEMENTED $24,212 $9,518 $5,714
99,805
kWh
$2,476
-
kW-mo/yr
$8,123
-
MMBtu
- $7,899
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs