| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Corrugated and solid fiber boxes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0641 #15 Y:2002 | 15 | 2002 | Switch to a solvent that can be cleaned and re-used | $673 | $1,275 | |
| UD0641 #14 Y:2002 | 14 | 2002 | Change rate schedules or other changes in utility service | $1,060 | - | |
| UD0641 #13 Y:2002 | 13 | 2002 | Use cooling tower or economizer to replace chiller cooling | $1,451 | $5,000 | |
| UD0641 #12 Y:2002 | 12 | 2002 | Utilize higher efficiency lamps and/or ballasts | $1,957 | $9,969 | |
| UD0641 #11 Y:2002 | 11 | 2002 | Install occupancy sensors | $2,180 | $121 | |
| UD0641 #10 Y:2002 | 10 | 2002 | Install compressor air intakes in coolest locations | $2,588 | $2,500 | |
| UD0641 #09 Y:2002 | 09 | 2002 | Disconnect ballasts | $2,709 | $1,968 | |
| UD0641 #08 Y:2002 | 08 | 2002 | Reprocess spent oils on site for re-use | $3,403 | $3,400 | |
| UD0641 #07 Y:2002 | 07 | 2002 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,676 | $22,800 | |
| UD0641 #06 Y:2002 | 06 | 2002 | Use radiant heater for spot heating | $15,849 | $22,500 | |
| UD0641 #05 Y:2002 | 05 | 2002 | Utilize higher efficiency lamps and/or ballasts | $16,888 | $59,307 | |
| UD0641 #04 Y:2002 | 04 | 2002 | Re-use or recycle hot or cold process exhaust air | $17,780 | $20,000 | |
| UD0641 #03 Y:2002 | 03 | 2002 | Use closed cycle process to minimize waste water production | $28,507 | $400 | |
| UD0641 #02 Y:2002 | 02 | 2002 | Use waste heat from hot flue gases to preheat | $31,699 | $37,000 | |
| UD0641 #01 Y:2002 | 01 | 2002 | Change procedures / equipment / operating conditions | $72,243 | - | |
| UD0556 #08 Y:1998 | 08 | 1998 | Install compressor air intakes in coolest locations | $532 | $200 | |
| UD0556 #07 Y:1998 | 07 | 1998 | Optimize plant power factor | $1,680 | $2,250 | |
| UD0556 #06 Y:1998 | 06 | 1998 | Meter recycled water (to reduce sewer charges) | $2,459 | - | |
| UD0556 #05 Y:1998 | 05 | 1998 | Utilize energy-efficient belts and other improved mechanisms | $2,784 | - | |
| UD0556 #04 Y:1998 | 04 | 1998 | Utilize higher efficiency lamps and/or ballasts | $3,225 | $11,147 |