Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Corrugated and solid fiber boxes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0641 #15 Y:2002 Switch to a solvent that can be cleaned and re-used $673 $1,275
UD0641 #14 Y:2002 Change rate schedules or other changes in utility service $1,060 -
UD0641 #13 Y:2002 Use cooling tower or economizer to replace chiller cooling $1,451 $5,000
UD0641 #12 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,957 $9,969
UD0641 #11 Y:2002 Install occupancy sensors $2,180 $121
UD0641 #10 Y:2002 Install compressor air intakes in coolest locations $2,588 $2,500
UD0641 #09 Y:2002 Disconnect ballasts $2,709 $1,968
UD0641 #08 Y:2002 Reprocess spent oils on site for re-use $3,403 $3,400
UD0641 #07 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $10,676 $22,800
UD0641 #06 Y:2002 Use radiant heater for spot heating $15,849 $22,500
UD0641 #05 Y:2002 Utilize higher efficiency lamps and/or ballasts $16,888 $59,307
UD0641 #04 Y:2002 Re-use or recycle hot or cold process exhaust air $17,780 $20,000
UD0641 #03 Y:2002 Use closed cycle process to minimize waste water production $28,507 $400
UD0641 #02 Y:2002 Use waste heat from hot flue gases to preheat $31,699 $37,000
UD0641 #01 Y:2002 Change procedures / equipment / operating conditions $72,243 -
UD0556 #08 Y:1998 Install compressor air intakes in coolest locations $532 $200
UD0556 #07 Y:1998 Optimize plant power factor $1,680 $2,250
UD0556 #06 Y:1998 Meter recycled water (to reduce sewer charges) $2,459 -
UD0556 #05 Y:1998 Utilize energy-efficient belts and other improved mechanisms $2,784 -
UD0556 #04 Y:1998 Utilize higher efficiency lamps and/or ballasts $3,225 $11,147