ITAC Assessment: SD0663
ITAC logo
ITAC Assessment: SD0663
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Packaging
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 129,911
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 4,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $374,245 1,960,139
kWh
Electricity Demand $489,061 7,182
kW-mo/yr
TOTAL YEARLY COSTS $863,306
RECOMMENDED SAVINGS* $1,079,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $672,356 $643,693 $267,802
1,402,840
kWh
$404,554
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $314,276 $12,865 $(-26,953.0)
(-141,189)
kWh
$341,229
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,060 $4,266 $4,721
24,730
kWh
$6,339
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,102 $3,252 $3,911
20,489
kWh
$4,190
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $33,214 $18,590 $9,442
49,460
kWh
$23,772
-
kW-mo/yr
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,191 - - $12,191
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,623 $500 $6,623
34,691
kWh
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,107 $2,287 $534
2,797
kWh
$573
-
kW-mo/yr
09 2.4239: Eliminate or reduce compressed air usage $3,465 $3,200 $3,465
18,149
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $6,427 $3,278 $3,103
16,252
kWh
$3,324
-
kW-mo/yr
11 2.7232: Replace existing hvac unit with high efficiency model $10,593 $35,000 $7,676
40,207
kWh
$2,917
-
kW-mo/yr
TOTAL RECOMMENDED $1,079,411 $726,931 $280,323
1,468,426
kWh
$799,089
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs