Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Setup paperboard boxes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0218 #06 Y:2023 Install set-back timers $473 $1,000
DL0218 #05 Y:2023 Recover waste heat from equipment $11,159 $10,000
DL0218 #04 Y:2023 Shut off cooling if cold outside air will cool process $10,992 $10,000
DL0218 #03 Y:2023 Re-use or recycle hot or cold process exhaust air $3,402 $750
DL0218 #02 Y:2023 Utilize controls to operate equipment only when needed $90,882 -
DL0218 #01 Y:2023 Reduce ventilation air $11,809 -
SD0566 #06 Y:2018 Use most efficient type of electric motors $2,156 $5,358
SD0566 #05 Y:2018 Reduce the pressure of compressed air to the minimum required $6,929 $1,200
SD0566 #04 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $11,548 $4,000
SD0566 #03 Y:2018 Use photocell controls $13,413 $3,068
SD0566 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $39,996 $72,976
SD0566 #01 Y:2018 Recharge batteries on during off-peak demand periods $100,744 $336,960
DL0150 #08 Y:2015 Convert combustion equipment to burn natural gas $7,020 $58,500
DL0150 #07 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,720 $18,100
DL0150 #06 Y:2015 Lower ceiling to reduce conditioned space $13,240 $62,400
DL0150 #05 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $6,075 $19,740
DL0150 #04 Y:2015 Install replacement doors $2,450 $7,800
DL0150 #03 Y:2015 Reduce illumination to minimum necessary levels $760 $560
DL0150 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,920 $500
DL0150 #01 Y:2015 Make a practice of turning off lights when not needed $780 -