ITAC Assessment: DL0218
ITAC logo
ITAC Assessment: DL0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cardboard boxes
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2652: Setup Paperboard Boxes
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 320,000
ft2
Annual Production 183,000
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $549,661 10,545,492
kWh
Electricity Demand $124,109 22,646
kW-mo/yr
Electricity Fees $4,383 -
Natural Gas $642,441 88,392
MMBtu
Waste Disposal Costs
Water Usage $60,166 5,519
Tgal
TOTAL YEARLY COSTS $1,380,760
RECOMMENDED SAVINGS* $128,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,252

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $11,809 - $665
12,784
kWh
$153
-
kW-mo/yr
$10,991
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $90,882 - $49,731
956,352
kWh
$11,476
-
kW-mo/yr
$29,675
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $3,402 $750 - - $3,402
-
MMBtu
04 2.2691: Shut off cooling if cold outside air will cool process $10,992 $10,000 - - $10,992
-
MMBtu
05 2.2437: Recover waste heat from equipment $11,159 $10,000 - - $11,159
-
MMBtu
06 2.6232: Install set-back timers $473 $1,000 - - $473
-
MMBtu
TOTAL RECOMMENDED $128,717 $21,750 $50,395
969,136
kWh
$11,630
-
kW-mo/yr
$66,692
-
MMBtu
TOTAL IMPLEMENTED $117,252 $10,750 $50,395
969,136
kWh
$11,630
-
kW-mo/yr
$55,227
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs