ITAC Assessment: UW2205
ITAC logo
ITAC Assessment: UW2205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Dry, Condensed, and Evaporated Dairy Product Manufacturing
NAICS 311514: Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 71
Plant Area 41,624
ft2
Annual Production 300,000
units
Production Hrs. Annual 5,304
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,062 1,810,676
kWh
Electricity Fees $123,645 -
Natural Gas $54,522 5,208
MMBtu
Waste Disposal Costs
Water Usage $12,267 2,290
Tgal
Water Disposal $100,535 830
Tgal
TOTAL YEARLY COSTS $468,032
RECOMMENDED SAVINGS* $8,397 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,244 $12,938 $4,244
43,401
kWh
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $169 $838 - $169
-
MMBtu
03 2.4133: Use most efficient type of electric motors $3,984 $15,999 $3,984
40,745
kWh
-
TOTAL RECOMMENDED $8,397 $29,775 $8,228
84,146
kWh
$169
-
MMBtu
TOTAL IMPLEMENTED $8,228 $28,937 $8,228
84,146
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs