ITAC Assessment: UA0057
ITAC logo
ITAC Assessment: UA0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Large Machined Metal Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 120,000
ft2
Annual Production 25
pieces
Production Hrs. Annual 3,744
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,414 2,484,300
kWh
Natural Gas $53,397 3,654
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,876 $3,000 $9,876
135,844
kWh
02 2.6231: Utilize controls to operate equipment only when needed $7,848 $80 $7,848
107,955
kWh
03 2.6218: Turn off equipment when not in use $4,400 $2,080 $4,400
60,519
kWh
04 2.7141: Lower light fixtures in high ceiling areas $11,362 $71,030 $11,362
156,290
kWh
05 2.7134: Use photocell controls $8,910 $1,742 $8,910
122,564
kWh
06 2.7111: Reduce illumination to minimum necessary levels $6,885 $250 $6,885
94,708
kWh
07 2.7261: Install timers and/or thermostats $3,185 $1,020 $3,185
43,813
kWh
08 2.4323: Use optimum size and capacity equipment $3,029 $12,535 $3,029
41,660
kWh
TOTAL RECOMMENDED $55,495 $91,737 $55,495
763,353
kWh
TOTAL IMPLEMENTED $22,124 $5,160 $22,124
304,318
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs