ITAC Assessment: SD0566
ITAC logo
ITAC Assessment: SD0566
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Corrugated Boxes
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2652: Setup Paperboard Boxes
Sales Range $50
M
to 100
M
# of Employees 134
Plant Area 460,857
ft2
Annual Production 938,435
units
Production Hrs. Annual 6,732
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,799 7,407,039
kWh
Electricity Demand $433,192 17,232
kW-mo/yr
Electricity Fees $10,781 -
Natural Gas $97,325 105,222
MMBtu
TOTAL YEARLY COSTS $1,028,097
RECOMMENDED SAVINGS* $174,786 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $167,857

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $100,744 $336,960 $(-3,169.0)
(-48,232)
kWh
$103,913
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $39,996 $72,976 $23,276
354,258
kWh
$16,201
-
kW-mo/yr
$519
03 2.7134: Use photocell controls $13,413 $3,068 $12,169
185,220
kWh
$1,244
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,548 $4,000 $11,548
175,773
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,929 $1,200 $6,929
105,464
kWh
- -
06 2.4133: Use most efficient type of electric motors $2,156 $5,358 $2,156
32,823
kWh
- -
TOTAL RECOMMENDED $174,786 $423,562 $52,909
805,306
kWh
$121,358
-
kW-mo/yr
$519
TOTAL IMPLEMENTED $167,857 $422,362 $45,980
699,842
kWh
$121,358
-
kW-mo/yr
$519
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs