Assessment Year | 2018 |
---|---|
Principal Product | Corrugated Boxes |
NAICS | 322219: Other Paperboard Container Manufacturing |
SIC | 2652: Setup Paperboard Boxes |
Sales Range | $50 M to 100M |
# of Employees | 134 |
Plant Area |
460,857
ft2
|
Annual Production | 938,435
units
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $486,799 | 7,407,039 |
kWh
|
$0.066 |
Electricity Demand | $433,192 | 17,232 |
kW-mo/yr
|
$25.14 |
Electricity Fees | $10,781 | - |
|
- |
Natural Gas | $97,325 | 105,222 |
MMBtu
|
$0.92 |
TOTAL YEARLY COSTS | $1,028,097 | |||
RECOMMENDED SAVINGS* | $174,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $167,857 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $100,744 | $336,960 |
$(-3,169.0)
(-48,232)
kWh
|
$103,913
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,996 | $72,976 |
$23,276
354,258
kWh
|
$16,201
-
kW-mo/yr
|
$519 | |
03 | 2.7134: Use photocell controls | $13,413 | $3,068 |
$12,169
185,220
kWh
|
$1,244
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,548 | $4,000 |
$11,548
175,773
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,929 | $1,200 |
$6,929
105,464
kWh
|
- | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,156 | $5,358 |
$2,156
32,823
kWh
|
- | - | |
TOTAL RECOMMENDED | $174,786 | $423,562 |
$52,909
805,306
kWh
|
$121,358
-
kW-mo/yr
|
$519 | ||
TOTAL IMPLEMENTED | $167,857 | $422,362 |
$45,980
699,842
kWh
|
$121,358
-
kW-mo/yr
|
$519 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs