ITAC Assessment: DL0150
ITAC logo
ITAC Assessment: DL0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Paper Products
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2652: Setup Paperboard Boxes
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 3,953
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,676 1,721,584
kWh
Electricity Demand $25,655 6,769
kW-mo/yr
Electricity Fees $11,214 -
Natural Gas $44,369 6,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $780 - $600
8,160
kWh
$180
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,920 $500 $1,670
22,830
kWh
$250
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $760 $560 $650
8,930
kWh
$110
-
kW-mo/yr
-
04 2.7495: Install replacement doors $2,450 $7,800 - - $2,450
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,075 $19,740 $3,170
43,480
kWh
$1,090
-
kW-mo/yr
$1,815
-
MMBtu
06 2.7292: Lower ceiling to reduce conditioned space $13,240 $62,400 - - $13,240
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,720 $18,100 $3,140
43,010
kWh
$580
-
kW-mo/yr
-
08 2.1332: Convert combustion equipment to burn natural gas $7,020 $58,500 - - $7,020
-
MMBtu
TOTAL RECOMMENDED $35,965 $167,600 $9,230
126,410
kWh
$2,210
-
kW-mo/yr
$24,525
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs