ITAC Assessment: UU0187
ITAC logo
ITAC Assessment: UU0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Animal Feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 139,000
ft2
Annual Production 400
ton
Production Hrs. Annual 4,200
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,608 649,840
kWh
Electricity Demand $68,007 4,117
kW-mo/yr
Electricity Fees $14,733 -
Natural Gas $36,607 6,206
MMBtu
TOTAL YEARLY COSTS $142,955
RECOMMENDED SAVINGS* $12,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $735

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings
01 2.3212: Optimize plant power factor $9,400 $14,500 - $9,400 - -
02 2.8114: Change rate schedules or other changes in utility service $1,910 $10,200 - - - $1,910
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $735 $1,470 $735
20,244
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $750 $870 - - $750
-
MMBtu
-
TOTAL RECOMMENDED $12,795 $27,040 $735
20,244
kWh
$9,400 $750
-
MMBtu
$1,910
TOTAL IMPLEMENTED $735 $1,470 $735
20,244
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs