| WV0038 #08 Y:1994 | 08 | 1994 | Install / repair insulation on steam lines | $7,763 | $1,001 | |
| WV0038 #07 Y:1994 | 07 | 1994 | Make a practice of turning off lights when not needed | $807 | - | |
| WV0038 #06 Y:1994 | 06 | 1994 | Install compressor air intakes in coolest locations | $962 | $150 | |
| WV0038 #05 Y:1994 | 05 | 1994 | Utilize energy-efficient belts and other improved mechanisms | $7,334 | - | |
| WV0038 #04 Y:1994 | 04 | 1994 | Direct warmest air to combustion intake | $81,877 | $4,570 | |
| WV0038 #03 Y:1994 | 03 | 1994 | Analyze flue gas for proper air/fuel ratio | $32,800 | $5,000 | |
| WV0038 #02 Y:1994 | 02 | 1994 | Use most efficient type of electric motors | $3,081 | $118,620 | |
| WV0038 #01 Y:1994 | 01 | 1994 | Utilize higher efficiency lamps and/or ballasts | $1,370 | $3,491 | |
| UD0266 #08 Y:1988 | 08 | 1988 | Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $155,320 | $875,000 | |
| UD0266 #07 Y:1988 | 07 | 1988 | Install equipment (eg compactor) to reduce disposal costs | $9,266 | $30,000 | |
| UD0266 #06 Y:1988 | 06 | 1988 | Utilize higher efficiency lamps and/or ballasts | $1,639 | $11,475 | |
| UD0266 #05 Y:1988 | 05 | 1988 | Recover heat from exhausted steam, hot air or hot water | $23,169 | $20,000 | |
| UD0266 #04 Y:1988 | 04 | 1988 | Repair and eliminate steam leaks | $21,603 | $5,000 | |
| UD0266 #03 Y:1988 | 03 | 1988 | Use adjustable frequency drive or multiple speed motors on existing system | $10,213 | $7,000 | |
| UD0266 #02 Y:1988 | 02 | 1988 | Eliminate or reduce compressed air usage | $462 | - | |
| UD0266 #01 Y:1988 | 01 | 1988 | Eliminate or reduce compressed air usage | $7,611 | $600 | |
| UD0135 #06 Y:1984 | 06 | 1984 | Reschedule plant operations or reduce load to avoid peaks | $37,591 | - | |
| UD0135 #05 Y:1984 | 05 | 1984 | Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $54,580 | - | |
| UD0135 #04 Y:1984 | 04 | 1984 | Install set-back timers | $4,080 | $770 | |
| UD0135 #03 Y:1984 | 03 | 1984 | Size electric motors for peak operating efficiency | $8,600 | $20,000 |