Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paperboard mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0038 #08 Y:1994 Install / repair insulation on steam lines $7,763 $1,001
WV0038 #07 Y:1994 Make a practice of turning off lights when not needed $807 -
WV0038 #06 Y:1994 Install compressor air intakes in coolest locations $962 $150
WV0038 #05 Y:1994 Utilize energy-efficient belts and other improved mechanisms $7,334 -
WV0038 #04 Y:1994 Direct warmest air to combustion intake $81,877 $4,570
WV0038 #03 Y:1994 Analyze flue gas for proper air/fuel ratio $32,800 $5,000
WV0038 #02 Y:1994 Use most efficient type of electric motors $3,081 $118,620
WV0038 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,370 $3,491
UD0266 #08 Y:1988 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $155,320 $875,000
UD0266 #07 Y:1988 Install equipment (eg compactor) to reduce disposal costs $9,266 $30,000
UD0266 #06 Y:1988 Utilize higher efficiency lamps and/or ballasts $1,639 $11,475
UD0266 #05 Y:1988 Recover heat from exhausted steam, hot air or hot water $23,169 $20,000
UD0266 #04 Y:1988 Repair and eliminate steam leaks $21,603 $5,000
UD0266 #03 Y:1988 Use adjustable frequency drive or multiple speed motors on existing system $10,213 $7,000
UD0266 #02 Y:1988 Eliminate or reduce compressed air usage $462 -
UD0266 #01 Y:1988 Eliminate or reduce compressed air usage $7,611 $600
UD0135 #06 Y:1984 Reschedule plant operations or reduce load to avoid peaks $37,591 -
UD0135 #05 Y:1984 Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $54,580 -
UD0135 #04 Y:1984 Install set-back timers $4,080 $770
UD0135 #03 Y:1984 Size electric motors for peak operating efficiency $8,600 $20,000