ITAC Assessment: WV0038
ITAC logo
ITAC Assessment: WV0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Recycled paper
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 159,000
ft2
Annual Production 72,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,685,226 43,542,498
kWh
Natural Gas $282,506 75,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,994 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,370 $3,491 $1,370
46,893
kWh
-
02 2.4133: Use most efficient type of electric motors $3,081 $118,620 $3,081
105,217
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $32,800 $5,000 - $32,800
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $81,877 $4,570 - $81,877
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,334 - $7,334
250,586
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $962 $150 $962
32,825
kWh
-
07 2.7124: Make a practice of turning off lights when not needed $807 - $807
27,550
kWh
-
08 2.2136: Install / repair insulation on steam lines $7,763 $1,001 - $7,763
-
MMBtu
TOTAL RECOMMENDED $135,994 $132,832 $13,554
463,071
kWh
$122,440
-
MMBtu
TOTAL IMPLEMENTED $12,592 $122,111 $12,592
430,246
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs