Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pulp mills
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0234 #04 Y:2020 Use photocell controls $34 $112
UA0234 #03 Y:2020 Utilize higher efficiency lamps and/or ballasts $638 $850
UA0234 #02 Y:2020 Optimize plant power factor $1,608 $7,769
UA0234 #01 Y:2020 Modify startup/shutdown times $17,505 -
WV0580 #06 Y:2019 Repair or replace steam traps $1,791 $5,731
WV0580 #05 Y:2019 Insulate bare equipment $2,238 $2,550
WV0580 #04 Y:2019 Recover waste heat from equipment $8,437 $15,360
WV0580 #03 Y:2019 Use waste heat to produce steam to drive a steam turbine-generator $52,590 $160,314
WV0580 #02 Y:2019 Analyze flue gas for proper air/fuel ratio $143,962 $6,000
WV0580 #01 Y:2019 Use waste heat from hot flue gases to preheat $265,061 $31,000
SU0452 #05 Y:2017 Upgrade obsolete equipment $25,555 $120,000
SU0452 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $347 $524
SU0452 #03 Y:2017 Eliminate/reduce an operation $16,784 $4,317
SU0452 #02 Y:2017 Pay bills on time to avoid late fees $2,111 -
SU0452 #01 Y:2017 Utilize energy-efficient belts and other improved mechanisms $4,109 -
UW0048 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $6,203 $2,440
UW0048 #01 Y:2011 Improve combustion control capability $308,364 $40,543
UW0030 #03 Y:2009 Optimize plant power factor $74,218 $166,366
UW0030 #02 Y:2009 Keep boiler tubes clean $115,460 $50,000
UW0030 #01 Y:2009 Use most efficient type of electric motors $134,729 $705,718