Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,986

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paper and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0037 #05 Y:2024 Apply for investment incentives $94,336 $5,000
NT0037 #04 Y:2024 Lower temperature during the winter season and vice-versa $482 -
NT0037 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $5,316 -
NT0037 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,403 $5,609
NT0037 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $577 $1,901
SD0663 #11 Y:2024 Replace existing hvac unit with high efficiency model $10,593 $35,000
SD0663 #10 Y:2024 Install compressor air intakes in coolest locations $6,427 $3,278
SD0663 #09 Y:2024 Eliminate or reduce compressed air usage $3,465 $3,200
SD0663 #08 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,107 $2,287
SD0663 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $6,623 $500
SD0663 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $12,191 -
SD0663 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $33,214 $18,590
SD0663 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $8,102 $3,252
SD0663 #03 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $11,060 $4,266
SD0663 #02 Y:2024 Use battery storage for demand control $314,276 $12,865
SD0663 #01 Y:2024 Use solar heat to make electricty $672,356 $643,693
SD0662 #10 Y:2024 Reschedule plant operations or reduce load to avoid peaks $167,076 -
SD0662 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,422 $2,278
SD0662 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $26,646 $15,968
SD0662 #07 Y:2024 Turn off equipment when not in use $30,392 $3,600