Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,130

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paper and allied products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0253 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $246 $333
WM0253 #06 Y:2025 Install occupancy sensors $480 $405
WM0253 #05 Y:2025 Reduce space conditioning during non-working hours $4,185 $520
WM0253 #04 Y:2025 Close holes and openings in building such as broken windows $4,905 $580
WM0253 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $5,066 -
WM0253 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $10,181 $12,600
WM0253 #01 Y:2025 Use waste heat from hot flue gases to preheat $11,263 $42,000
UW2510 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,923 $9,402
UW2510 #02 Y:2025 Add equipment/ operators to reduce production bottleneck $10,639,200 $32,000,000
UW2510 #01 Y:2025 Install compressor air intakes in coolest locations $1,701 $4,278
WM0249 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,131 -
WM0249 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,396 $4,125
WM0249 #03 Y:2025 Install compressor air intakes in coolest locations $1,484 $2,740
WM0249 #02 Y:2025 Lower temperature during the winter season and vice-versa $2,929 -
WM0249 #01 Y:2025 Reduce space conditioning during non-working hours $3,470 -
LT8434 #05 Y:2025 Install equipment (eg compactor) to reduce disposal costs $17,419 $26,512
LT8434 #04 Y:2025 Change rate schedules or other changes in utility service $1,538 -
LT8434 #03 Y:2025 Modify facility to avoid excess maintenance costs $2,709 $870
LT8434 #02 Y:2025 Use automatic cleaning equipment $104,776 $353
LT8434 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $832 $525