Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Public building and related furniture
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0305 #03 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,851 $244
MS0305 #02 Y:2006 Utilize higher efficiency lamps and/or ballasts $3,385 $16,886
MS0305 #01 Y:2006 Use waste heat to produce steam to drive a steam turbine-generator $48,733 $70,000
MS0183 #06 Y:2001 Eliminate leaks in water lines and valves $1,296 $50
MS0183 #05 Y:2001 Convert from batch operation to continuous processing $1,957 $432
MS0183 #04 Y:2001 Utilize higher efficiency lamps and/or ballasts $711 $2,074
MS0183 #03 Y:2001 Install occupancy sensors $142 $230
MS0183 #02 Y:2001 Eliminate leaks in inert gas and compressed air lines/ valves $1,000 $190
MS0183 #01 Y:2001 Optimize plant power factor $7,236 $8,235
MS0095 #08 Y:1997 Distill contaminated solvents for reuse $142,935 $162,000
MS0095 #07 Y:1997 Replace city water with recycled water via cooling tower $45,259 $8,955
MS0095 #06 Y:1997 Change procedures / equipment / operating conditions $41,338 $19,152
MS0095 #05 Y:1997 Insulate bare equipment $2,730 $6,255
MS0095 #04 Y:1997 Disconnect ballasts $1,814 $1,602
MS0095 #03 Y:1997 Utilize higher efficiency lamps and/or ballasts $20,715 $38,711
MS0095 #02 Y:1997 Recover waste heat from equipment $8,674 $14,571
MS0095 #01 Y:1997 Optimize plant power factor $26,582 $9,750