ITAC Assessment: MS0095
ITAC logo
ITAC Assessment: MS0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Office Furniture
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $50
M
to 100
M
# of Employees 575
Plant Area 600,000
ft2
Annual Production 4,556,471
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,065 12,326,788
kWh
Electricity Demand $231,434 29,231
kW-mo/yr
Electricity Fees $17,177 -
Natural Gas $269,340 75,661
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $290,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $101,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Water Consumption Savings
01 2.3212: Optimize plant power factor $26,582 $9,750 - - $26,582 - - - -
02 2.2437: Recover waste heat from equipment $8,674 $14,571 - - - $8,674
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $20,715 $38,711 $12,925
418,230
kWh
$7,790
-
kW-mo/yr
- - - - -
04 2.7122: Disconnect ballasts $1,814 $1,602 $1,159
37,515
kWh
$655
-
kW-mo/yr
- - - - -
05 2.2511: Insulate bare equipment $2,730 $6,255 - - - $2,730
-
MMBtu
- - -
06 3.1191: Change procedures / equipment / operating conditions $41,338 $19,152 - - - - - $41,338
-
lb
-
07 3.4114: Replace city water with recycled water via cooling tower $45,259 $8,955 $(-4,296.0)
(-139,508)
kWh
$(-2,173.0)
-
kW-mo/yr
- - - - $51,728
-
Tgal
08 3.8142: Distill contaminated solvents for reuse $142,935 $162,000 - $(-4,566.0)
-
kW-mo/yr
- - $147,501
-
gal
- -
TOTAL RECOMMENDED $290,047 $260,996 $9,788
316,237
kWh
$1,706
-
kW-mo/yr
$26,582 $11,404
-
MMBtu
$147,501
-
gal
$41,338
-
lb
$51,728
-
Tgal
TOTAL IMPLEMENTED $101,230 $71,987 $8,629
278,722
kWh
$5,617
-
kW-mo/yr
$26,582 $8,674
-
MMBtu
- - $51,728
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs