Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Household furniture, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0162 #06 Y:2003 Install compressor air intakes in coolest locations $538 $134
SU0162 #05 Y:2003 Reduce the pressure of compressed air to the minimum required $1,349 -
SU0162 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $1,363 $221
SU0162 #03 Y:2003 Insulate bare equipment $10,022 $350
SU0162 #02 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $8,701 $33,700
SU0162 #01 Y:2003 Modify workload $115,150 $12,371
LM0043 #06 Y:2002 Develop standard procedures to improve internal yields $27,000 $19,260
LM0043 #05 Y:2002 Use or replace with energy efficient substitutes $284 $331
LM0043 #04 Y:2002 Use most efficient type of electric motors $2,618 $910
LM0043 #03 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $3,002 $250
LM0043 #02 Y:2002 Utilize higher efficiency lamps and/or ballasts $3,494 $2,354
LM0043 #01 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,510 $1,365
LM0038 #08 Y:2002 Eliminate old stock and modify inventory control $22,500 $1,000
LM0038 #07 Y:2002 Eliminate/reduce redundant inspections $39,000 $20,250
LM0038 #06 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,602 $60
LM0038 #05 Y:2002 Add area lighting switches $898 $800
LM0038 #04 Y:2002 Utilize higher efficiency lamps and/or ballasts $2,190 $90
LM0038 #03 Y:2002 Eliminate or reduce compressed air usage $13,662 $1,100
LM0038 #02 Y:2002 Install compressor air intakes in coolest locations $1,001 $200
LM0038 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $337 $250