ITAC Assessment: LM0038
ITAC logo
ITAC Assessment: LM0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product television plastic cabinets
NAICS
n/a
SIC 2519: Household Furniture, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 84,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 1,952
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,230 894,660
kWh
Electricity Demand $29,770 3,564
kW-mo/yr
Electricity Fees $5,618 -
Natural Gas $43,928 6,884
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $337 $250 $853
6,802
kWh
$264
-
kW-mo/yr
$(-780.0) -
02 2.4221: Install compressor air intakes in coolest locations $1,001 $200 $766
6,106
kWh
$235
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $13,662 $1,100 $10,442
83,468
kWh
$3,220
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,190 $90 $1,821
14,523
kWh
$369
-
kW-mo/yr
- -
05 2.7131: Add area lighting switches $898 $800 $687
5,481
kWh
$211
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,602 $60 $1,348
10,277
kWh
$254
-
kW-mo/yr
- -
07 4.425: Eliminate/reduce redundant inspections $39,000 $20,250 - - $39,000 -
08 4.322: Eliminate old stock and modify inventory control $22,500 $1,000 - - - $22,500
TOTAL RECOMMENDED $81,190 $23,750 $15,917
126,657
kWh
$4,553
-
kW-mo/yr
$38,220 $22,500
TOTAL IMPLEMENTED $19,690 $2,500 $15,917
126,657
kWh
$4,553
-
kW-mo/yr
$(-780.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs