ITAC Assessment: SU0162
ITAC logo
ITAC Assessment: SU0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Casual resin furniture, wall décor
NAICS
n/a
SIC 2519: Household Furniture, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 187,200
ft2
Annual Production 8,500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $415,295 12,584,704
kWh
Electricity Demand $314,011 60,855
kW-mo/yr
Electricity Fees $9,734 -
Natural Gas $184,829 23,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $128,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 4.426: Modify workload $115,150 $12,371 - $115,150
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,701 $33,700 $8,701
263,673
kWh
-
03 2.2511: Insulate bare equipment $10,022 $350 $10,022
303,701
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,363 $221 $1,363
41,321
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,349 - $1,349
35,998
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $538 $134 $538
16,308
kWh
-
TOTAL RECOMMENDED $137,123 $46,776 $21,973
661,001
kWh
$115,150
TOTAL IMPLEMENTED $128,422 $13,076 $13,272
397,328
kWh
$115,150
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs