Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Reconstituted wood products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8405 #03 Y:2024 Install equipment (eg compactor) to reduce disposal costs $29,983 $78,432
LT8405 #02 Y:2024 Install equipment (eg compactor) to reduce disposal costs $14,646 $48,894
LT8405 #01 Y:2024 Install occupancy sensors $3,869 $6,130
AM0397 #08 Y:2001 Ship hydraulic oil to secondary fuel program $600 -
AM0397 #07 Y:2001 Make a practice of turning off lights when not needed $5,700 -
AM0397 #06 Y:2001 Use insulation in furnaces to facilitate heating / cooling $11,700 $1,400
AM0397 #05 Y:2001 Use synthetic lubricant $13,950 -
AM0397 #04 Y:2001 Use a less expensive method of waste removal $18,400 -
AM0397 #03 Y:2001 Optimize plant power factor $20,000 $60,000
AM0397 #02 Y:2001 Install equipment (eg compactor) to reduce disposal costs $24,500 -
AM0397 #01 Y:2001 Insulate bare equipment $67,500 $1,500
AM0367 #08 Y:1999 Use synthetic lubricant $130 -
AM0367 #07 Y:1999 Pay bills on time to avoid late fees $234 -
AM0367 #06 Y:1999 Utilize controls to operate equipment only when needed $355 -
AM0367 #05 Y:1999 Replace existing equipment with more suitable substitutes $505 $290
AM0367 #04 Y:1999 Turn off equipment during breaks, reduce operating time $560 -
AM0367 #03 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $1,090 $500
AM0367 #02 Y:1999 Reschedule plant operations or reduce load to avoid peaks $1,560 -
AM0367 #01 Y:1999 Replace existing equipment with more suitable substitutes $3,240 $565