ITAC Assessment: AM0367
ITAC logo
ITAC Assessment: AM0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Custom sheeting of fiberboard
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 52,320
ft2
Annual Production 8,400,000
lb
Production Hrs. Annual 6,192
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,355 1,579,719
kWh
Electricity Demand $29,269 4,683
kW-mo/yr
Natural Gas $4,445 957
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,674

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 4.652: Replace existing equipment with more suitable substitutes $3,240 $565 - - $3,240
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,560 - - $1,560
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,090 $500 $1,090
45,428
kWh
- -
04 2.6212: Turn off equipment during breaks, reduce operating time $560 - $560
23,447
kWh
- -
05 4.652: Replace existing equipment with more suitable substitutes $505 $290 $60
2,638
kWh
$25
-
kW-mo/yr
$420
06 2.6231: Utilize controls to operate equipment only when needed $355 - $355
14,947
kWh
- -
07 4.821: Pay bills on time to avoid late fees $234 - - - $234
08 2.4314: Use synthetic lubricant $130 - $85
3,517
kWh
$45
-
kW-mo/yr
-
TOTAL RECOMMENDED $7,674 $1,355 $2,150
89,977
kWh
$1,630
-
kW-mo/yr
$3,894
TOTAL IMPLEMENTED $7,674 $1,355 $2,150
89,977
kWh
$1,630
-
kW-mo/yr
$3,894
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs