Assessment Year | 2000 |
---|---|
Principal Product | Custom sheeting of fiberboard |
NAICS |
n/a
|
SIC | 2493: Reconstituted Wood Products |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
52,320
ft2
|
Annual Production | 8,400,000
lb
|
Production Hrs. Annual | 6,192
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $41,355 | 1,579,719 |
kWh
|
$0.026 |
Electricity Demand | $29,269 | 4,683 |
kW-mo/yr
|
$6.25 |
Natural Gas | $4,445 | 957 |
MMBtu
|
$4.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,674 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,674 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $3,240 | $565 | - | - | $3,240 | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,560 | - | - |
$1,560
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,090 | $500 |
$1,090
45,428
kWh
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $560 | - |
$560
23,447
kWh
|
- | - | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $505 | $290 |
$60
2,638
kWh
|
$25
-
kW-mo/yr
|
$420 | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $355 | - |
$355
14,947
kWh
|
- | - | |
07 | 4.821: Pay bills on time to avoid late fees | $234 | - | - | - | $234 | |
08 | 2.4314: Use synthetic lubricant | $130 | - |
$85
3,517
kWh
|
$45
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $7,674 | $1,355 |
$2,150
89,977
kWh
|
$1,630
-
kW-mo/yr
|
$3,894 | ||
TOTAL IMPLEMENTED | $7,674 | $1,355 |
$2,150
89,977
kWh
|
$1,630
-
kW-mo/yr
|
$3,894 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs