22
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Reconstituted wood products | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1107 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,839 | $5,280 | |
| UD1107 #04 Y:2025 | 04 | 2025 | Eliminate or reduce compressed air usage | $412 | $900 | |
| UD1107 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,345 | $953 | |
| UD1107 #02 Y:2025 | 02 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $69,274 | - | |
| UD1107 #01 Y:2025 | 01 | 2025 | Optimize plant power factor | $228,685 | $136,500 | |
| WV0466 #13 Y:2012 | 13 | 2012 | Develop a repair/replace policy | $477 | $470 | |
| WV0466 #12 Y:2012 | 12 | 2012 | Eliminate or reduce compressed air usage | $1,001 | $113 | |
| WV0466 #11 Y:2012 | 11 | 2012 | Use waste heat from flue gases to heat space conditioning air | $1,129 | $5,550 | |
| WV0466 #10 Y:2012 | 10 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,248 | $30 | |
| WV0466 #09 Y:2012 | 09 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,160 | $488 | |
| WV0466 #08 Y:2012 | 08 | 2012 | Improve lubrication practices | $2,167 | $1,000 | |
| WV0466 #07 Y:2012 | 07 | 2012 | Burn waste oil for heat | $2,530 | $4,000 | |
| WV0466 #06 Y:2012 | 06 | 2012 | Optimize plant power factor | $3,614 | $5,600 | |
| WV0466 #05 Y:2012 | 05 | 2012 | Use waste heat from hot flue gases to preheat | $12,752 | $3,840 | |
| WV0466 #04 Y:2012 | 04 | 2012 | Establish a predictive maintenance program | $11,321 | $1,000 | |
| WV0466 #03 Y:2012 | 03 | 2012 | Utilize energy-efficient belts and other improved mechanisms | $11,380 | - | |
| WV0466 #02 Y:2012 | 02 | 2012 | Insulate bare equipment | $15,207 | $35,976 | |
| WV0466 #01 Y:2012 | 01 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $73,182 | $32,900 | |
| UD0185 #04 Y:1985 | 04 | 1985 | Use hot process fluids to preheat incoming process fluids | $3,556 | $9,700 | |
| UD0185 #03 Y:1985 | 03 | 1985 | Use proper thickness of insulation on building envelope | $2,108 | $5,100 |