Assessment Year | 1985 |
---|---|
Principal Product | HARDBOARD & PARTICLE BOARD |
NAICS |
n/a
|
SIC | 2493: Reconstituted Wood Products |
Sales Range | $5 M to 10M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 60,000
thousand feet
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $169,098 | 2,123,974 |
kWh
|
$0.080 |
Natural Gas | $69,332 | 13,304 |
MMBtu
|
$5.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,456 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $33,827 | $54,000 |
$39,385
218,933
kWh
|
$(-5,558.0)
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,629 | $30,202 |
$11,431
185,229
kWh
|
$(-2,533.0)
-
MMBtu
|
$3,731 | |
03 | 2.7492: Use proper thickness of insulation on building envelope | $2,108 | $5,100 | - |
$2,108
-
MMBtu
|
- | |
04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $3,556 | $9,700 | - |
$3,556
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $52,120 | $99,002 |
$50,816
404,162
kWh
|
$(-2,427.0)
-
MMBtu
|
$3,731 | ||
TOTAL IMPLEMENTED | $46,456 | $84,202 |
$50,816
404,162
kWh
|
$(-8,091.0)
-
MMBtu
|
$3,731 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs