ITAC Assessment: UD0185
ITAC logo
ITAC Assessment: UD0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HARDBOARD & PARTICLE BOARD
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area
n/a
Annual Production 60,000
thousand feet
Production Hrs. Annual 4,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,098 2,123,974
kWh
Natural Gas $69,332 13,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $33,827 $54,000 $39,385
218,933
kWh
$(-5,558.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,629 $30,202 $11,431
185,229
kWh
$(-2,533.0)
-
MMBtu
$3,731
03 2.7492: Use proper thickness of insulation on building envelope $2,108 $5,100 - $2,108
-
MMBtu
-
04 2.2444: Use hot process fluids to preheat incoming process fluids $3,556 $9,700 - $3,556
-
MMBtu
-
TOTAL RECOMMENDED $52,120 $99,002 $50,816
404,162
kWh
$(-2,427.0)
-
MMBtu
$3,731
TOTAL IMPLEMENTED $46,456 $84,202 $50,816
404,162
kWh
$(-8,091.0)
-
MMBtu
$3,731
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs