ITAC Assessment: AM0380
ITAC logo
ITAC Assessment: AM0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product machine shop products, parts for aircraft
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 150,000
ft2
Annual Production 86,000
pieces
Production Hrs. Annual 2,932
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,704 1,587,339
kWh
Electricity Demand $46,062 6,024
kW-mo/yr
Electricity Fees $672 -
Natural Gas $6,914 1,274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $9,200 $1,000 - - - $9,200 - - -
02 2.8112: Combine utility meters $3,644 $8,000 - $3,140
-
kW-mo/yr
$504 - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,800 $50 $1,800
39,859
kWh
- - - - - -
04 2.8118: Check for accuracy of utility / power meters $1,798 - - - - - - - $1,798
05 2.8121: Apply for tax-free status for energy purchases $527 $800 - - - - $527 - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $520 $25 $300
6,741
kWh
$220
-
kW-mo/yr
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $600 $1,000 $280
6,155
kWh
$320
-
kW-mo/yr
- - - - -
08 3.1161: Eliminate/reduce an operation $392 - - - - - - $392 -
09 2.7124: Make a practice of turning off lights when not needed $265 - $150
3,224
kWh
$115
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $18,746 $10,875 $2,530
55,979
kWh
$3,795
-
kW-mo/yr
$504 $9,200 $527 $392 $1,798
TOTAL IMPLEMENTED $8,554 $8,875 $2,250
49,824
kWh
$3,475
-
kW-mo/yr
$504 - $527 - $1,798
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings