ITAC Assessment: KU0420
ITAC logo
ITAC Assessment: KU0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cast Removal Systems
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 43,960
ft2
Annual Production 0
units
Production Hrs. Annual 2,860
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,502 472,157
kWh
Natural Gas $34,543 6,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $5,244 $12,675 - $5,244
-
MMBtu
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,461 $2,079 - $1,461
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $830 $630 $830
9,672
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $226 $113 $226
2,638
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $126 $30 $126
1,465
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $427 - $427
4,982
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $403 $512 $151
1,758
kWh
- $252
TOTAL RECOMMENDED $8,717 $16,039 $1,760
20,515
kWh
$6,705
-
MMBtu
$252
TOTAL IMPLEMENTED $830 $630 $830
9,672
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs