Assessment Year | 2017 |
---|---|
Principal Product | Plastic Lab-ware |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
Sales Range | $50 M to 100M |
# of Employees | 174 |
Plant Area |
130,000
ft2
|
Annual Production | 170
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $346,637 | 11,292,023 |
kWh
|
$0.031 | |
Electricity Demand | $219,903 | 28,431 |
kW-mo/yr
|
$7.73 | |
Natural Gas | $7,520 | 1,334 |
MMBtu
|
$5.64 | |
Waste Disposal Costs | |||||
Water Usage | $6,500 | 800 |
Tgal
|
$8.13 | |
TOTAL YEARLY COSTS | $580,560 | ||||
RECOMMENDED SAVINGS* | $46,985 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,735 | - |
$2,735
88,241
kWh
|
- | - | - | |
02 | 2.7122: Disconnect ballasts | $1,881 | - |
$1,344
43,355
kWh
|
$537
-
kW-mo/yr
|
- | - | |
03 | 3.1161: Eliminate/reduce an operation | $22,179 | $350 |
$(-233.0)
(-7,500)
kWh
|
$(-278.0)
-
kW-mo/yr
|
$11,690 | $11,000 | |
04 | 2.7135: Install occupancy sensors | $906 | $968 |
$906
29,241
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,680 | $5,451 |
$4,680
150,982
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,489 | $22,737 |
$7,280
234,824
kWh
|
$2,909
-
kW-mo/yr
|
$3,922 | $378 | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $115 | $551 |
$115
3,723
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $46,985 | $30,057 |
$16,827
542,866
kWh
|
$3,168
-
kW-mo/yr
|
$15,612 | $11,378 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs