Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Reconstituted wood products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CC0032 #07 Y:2023 Optimize plant power factor $600 $6,750
CC0032 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $59,248 -
CC0032 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $47,565 $84,000
CC0032 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $13,869 $14,141
CC0032 #03 Y:2023 Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat $314,706 $1,607,040
CC0032 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,274 $7,400
CC0032 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $15,760 -
NC0624 #05 Y:2018 Repair furnaces and oven doors so that they seal efficiently $9,555 $2,000
NC0624 #04 Y:2018 Avoid rewinding motors more than twice $39,622 $58,313
NC0624 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $107 $450
NC0624 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $5,403 $200
NC0624 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $37,704 $24,212
NC0427 #12 Y:2011 Increase amount of condensate returned $126,880 $500,000
NC0427 #11 Y:2011 Begin a practice of predictive / preventative maintenance $2,500 $1,050
NC0427 #10 Y:2011 Repair or replace steam traps $5,500 $150
NC0427 #09 Y:2011 Repair and eliminate steam leaks $106,205 $1,200
NC0427 #08 Y:2011 Begin a practice of predictive / preventative maintenance $3,000 $600
NC0427 #07 Y:2011 Insulate feedwater tank $3,200 $1,200
NC0427 #06 Y:2011 Begin a practice of predictive / preventative maintenance $10,000 $200
NC0427 #05 Y:2011 Lower operating pressure of condenser (steam) $178,345 $50,000