1,433
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
DL0245 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,824 | $1,592 |
n/a
|
DL0245 #05 Y:2024 | 05 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $4,607 | $6,000 |
n/a
|
DL0245 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $5,089 | $9,630 |
n/a
|
DL0245 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $19,536 | $53,470 |
n/a
|
DL0245 #02 Y:2024 | 02 | 2024 | Turn off equipment during breaks, reduce operating time | $774 | - |
n/a
|
DL0245 #01 Y:2024 | 01 | 2024 | Turn off equipment during breaks, reduce operating time | $2,149 | - |
n/a
|
LS2420 #06 Y:2024 | 06 | 2024 | Install isolation transformer on adjustable frequency drive | $11,877 | $51,800 |
n/a
|
LS2420 #05 Y:2024 | 05 | 2024 | Clean or color roof to reduce solar load | $24,642 | $68,828 |
n/a
|
LS2420 #04 Y:2024 | 04 | 2024 | Upgrade controls on compressors | $9,307 | $21,000 |
n/a
|
LS2420 #03 Y:2024 | 03 | 2024 | Size electric motors for peak operating efficiency | $16,356 | $15,100 |
n/a
|
LS2420 #02 Y:2024 | 02 | 2024 | Install timers and/or thermostats | $1,025 | $25 |
n/a
|
LS2420 #01 Y:2024 | 01 | 2024 | Level zero – install control systems for existing equipment | $7,485 | - |
n/a
|
NL0094 #07 Y:2024 | 07 | 2024 | Use photocell controls | $196 | $97 |
n/a
|
NL0094 #06 Y:2024 | 06 | 2024 | Eliminate or reduce compressed air usage | $332 | $160 |
n/a
|
NL0094 #05 Y:2024 | 05 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $635 | $583 |
n/a
|
NL0094 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $731 | $2,110 |
n/a
|
NL0094 #03 Y:2024 | 03 | 2024 | Install outside air damper / economizer on hvac unit | $1,003 | $2,741 |
n/a
|
NL0094 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,784 | $4,500 |
n/a
|
NL0094 #01 Y:2024 | 01 | 2024 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $72,558 | $568,000 |
n/a
|
SJ0020 #08 Y:2024 | 08 | 2024 | Replace fossil fuel equipment with electrical equipment | $2,868 | $15,989 |
n/a
|