517
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OR0798 #07 Y:2024 | 07 | 2024 | Use or replace with energy efficient substitutes | $6,445 | $64,276 |
n/a
|
OR0798 #06 Y:2024 | 06 | 2024 | Use radiant heater for spot heating | $921 | $8,538 |
n/a
|
OR0798 #05 Y:2024 | 05 | 2024 | Use solar heat to make electricty | $13,899 | $90,000 |
n/a
|
OR0798 #04 Y:2024 | 04 | 2024 | Upgrade obsolete equipment | $19,584 | $93,860 |
n/a
|
OR0798 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,382 | $4,736 |
n/a
|
OR0798 #02 Y:2024 | 02 | 2024 | Install vinyl strip / high speed / air curtain doors | $733 | $2,196 |
n/a
|
OR0798 #01 Y:2024 | 01 | 2024 | Recycle air for heating, ventilation and air conditioning | $1,715 | $502 |
n/a
|
OR0794 #06 Y:2024 | 06 | 2024 | Use or replace with energy efficient substitutes | $13,489 | $12,623 |
n/a
|
OR0794 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,153 | $7,546 |
n/a
|
OR0794 #04 Y:2024 | 04 | 2024 | Use solar heat to make electricty | $12,662 | $67,250 |
n/a
|
OR0794 #03 Y:2024 | 03 | 2024 | Replace fossil fuel equipment with electrical equipment | $20,545 | $92,473 |
n/a
|
OR0794 #02 Y:2024 | 02 | 2024 | Eliminate or reduce compressed air usage | $2,287 | $5,523 |
n/a
|
OR0794 #01 Y:2024 | 01 | 2024 | Utilize controls to operate equipment only when needed | $1,236 | $1,629 |
n/a
|
OR0755 #07 Y:2022 | 07 | 2022 | Replace boiler | $3,641,663 | $6,124,080 | |
OR0755 #06 Y:2022 | 06 | 2022 | Optimize plant power factor | $13,297 | $55,141 | |
OR0755 #05 Y:2022 | 05 | 2022 | Eliminate or reduce compressed air usage | $10,503 | $23,536 | |
OR0755 #04 Y:2022 | 04 | 2022 | Replace hydraulic / pneumatic equipment with electric equipment | $1,507,357 | $45,058 | |
OR0755 #03 Y:2022 | 03 | 2022 | Change procedures / equipment / operating conditions | $4,555 | - | |
OR0755 #02 Y:2022 | 02 | 2022 | Reduce the pressure of compressed air to the minimum required | $8,881 | - | |
OR0755 #01 Y:2022 | 01 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $10,233 | - |