Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood containers, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0298 #11 Y:2020 Change rate schedules or other changes in utility service $77,234 $900
MZ0298 #10 Y:2020 Maintain air filters by cleaning or replacement $756 $288
MZ0298 #09 Y:2020 Meter recycled water (to reduce sewer charges) $29,362 $25,600
MZ0298 #08 Y:2020 Install occupancy sensors $1,093 $1,639
MZ0298 #07 Y:2020 Utilize higher efficiency lamps and/or ballasts $1,731 $2,790
MZ0298 #06 Y:2020 Install partitions to reduce size of conditioned space $8,154 -
MZ0298 #05 Y:2020 Utilize energy-efficient belts and other improved mechanisms $4,537 $740
MZ0298 #04 Y:2020 Eliminate or reduce compressed air usage $544 $2,220
MZ0298 #03 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $5,824 $8,850
MZ0298 #02 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $10,146 $350
MZ0298 #01 Y:2020 Reduce the pressure of compressed air to the minimum required $11,238 $800
MZ0297 #08 Y:2020 Maintain air filters by cleaning or replacement $397 $300
MZ0297 #07 Y:2020 Utilize energy-efficient belts and other improved mechanisms $3,001 $1,050
MZ0297 #06 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,857 $350
MZ0297 #05 Y:2020 Utilize higher efficiency lamps and/or ballasts $1,880 $2,595
MZ0297 #04 Y:2020 Install occupancy sensors $320 $840
MZ0297 #03 Y:2020 Optimize plant power factor $7,129 $24,780
MZ0297 #02 Y:2020 Reduce the pressure of compressed air to the minimum required $773 $320
MZ0297 #01 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $22,041 $51,700
SU0490 #05 Y:2019 Use photocell controls $39 $183