ITAC Assessment: MZ0298
ITAC logo
ITAC Assessment: MZ0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Oak wood wine and whiskey barrels
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2449: Wood Containers, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 420,000
ft2
Annual Production 780,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,394,184 20,382,480
kWh
Electricity Demand $448,603 47,216
kW-mo/yr
Natural Gas $258,554 33,148
MMBtu
Waste Disposal Costs
Water Usage $28,604 1,882,209
Tgal
Water Disposal $58,238 1,882,209
Tgal
TOTAL YEARLY COSTS $2,188,183
RECOMMENDED SAVINGS* $150,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $11,238 $800 $8,423
123,880
kWh
$2,815
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,146 $350 $7,672
112,821
kWh
$2,474
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,824 $8,850 $5,824
85,635
kWh
- - - -
04 2.4239: Eliminate or reduce compressed air usage $544 $2,220 $544
8,000
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,537 $740 $3,431
50,455
kWh
$1,106
-
kW-mo/yr
- - -
06 2.7496: Install partitions to reduce size of conditioned space $8,154 - $6,165
90,668
kWh
$1,989
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,731 $2,790 $921
13,541
kWh
$297
-
kW-mo/yr
- - $513
08 2.7135: Install occupancy sensors $1,093 $1,639 $1,093
16,067
kWh
- - - -
09 3.4116: Meter recycled water (to reduce sewer charges) $29,362 $25,600 - - $29,362
-
Tgal
- -
10 2.6127: Maintain air filters by cleaning or replacement $756 $288 $756
11,123
kWh
- - - -
11 2.8114: Change rate schedules or other changes in utility service $77,234 $900 - - - $77,234 -
TOTAL RECOMMENDED $150,619 $44,177 $34,829
512,190
kWh
$8,681
-
kW-mo/yr
$29,362
-
Tgal
$77,234 $513
TOTAL IMPLEMENTED $110,019 $17,777 $26,406
388,310
kWh
$5,866
-
kW-mo/yr
- $77,234 $513
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings