ITAC Assessment: CO0353
ITAC logo
ITAC Assessment: CO0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product buses
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $50
M
to 100
M
# of Employees 365
Plant Area 200,000
ft2
Annual Production 320
pieces
Production Hrs. Annual 4,576
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,453 2,180,539
kWh
Electricity Demand $54,004 7,620
kW-mo/yr
Electricity Fees $(-12.0) -
Natural Gas $78,456 15,823
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $128,394

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $92,720 $50,000 - - - $5,220
-
lb
- $87,500
02 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $24,450 $4,000 - - $7,370
-
gal
- $4,580 $12,500
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,709 $16,548 $4,582
96,424
kWh
$2,127
-
kW-mo/yr
- - - -
04 2.4322: Use or replace with energy efficient substitutes $6,550 $56,160 $3,860
81,477
kWh
$2,690
-
kW-mo/yr
- - - -
05 2.4221: Install compressor air intakes in coolest locations $2,020 $700 $1,450
30,481
kWh
$570
-
kW-mo/yr
- - - -
06 3.8132: Use less toxic and volatile solvent substitutes $1,582 $3,680 - - $2,914
-
gal
$(-168.0)
-
lb
- $(-1,164.0)
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $990 $220 $710
14,947
kWh
$280
-
kW-mo/yr
- - - -
08 2.4133: Use most efficient type of electric motors $82 $53 $70
1,465
kWh
$12
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $135,103 $131,361 $10,672
224,794
kWh
$5,679
-
kW-mo/yr
$10,284
-
gal
$5,052
-
lb
$4,580 $98,836
TOTAL IMPLEMENTED $128,394 $114,813 $6,090
128,370
kWh
$3,552
-
kW-mo/yr
$10,284
-
gal
$5,052
-
lb
$4,580 $98,836
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs