ITAC Assessment: SU0490
ITAC logo
ITAC Assessment: SU0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Lightweight Aggregates
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2449: Wood Containers, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 10,977,120
ft2
Annual Production 225,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,346 12,651,639
kWh
Electricity Demand $94,380 21,408
kW-mo/yr
Electricity Fees $45,286 -
Natural Gas $286,657 68,900
MMBtu
TOTAL YEARLY COSTS $986,669
RECOMMENDED SAVINGS* $14,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $1,780 $532 $1,780
40,454
kWh
- - -
02 2.7135: Install occupancy sensors $809 $277 $809
18,396
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,302 $10,531 $11,673
265,302
kWh
$1,429
-
kW-mo/yr
$122 $(-1,922.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $177 $181 $89
2,014
kWh
$12
-
kW-mo/yr
$31 $45
05 2.7134: Use photocell controls $39 $183 $39
876
kWh
- - -
TOTAL RECOMMENDED $14,107 $11,704 $14,390
327,042
kWh
$1,441
-
kW-mo/yr
$153 $(-1,877.0)
TOTAL IMPLEMENTED $13,298 $11,427 $13,581
308,646
kWh
$1,441
-
kW-mo/yr
$153 $(-1,877.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs