Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Wood containers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0525 #08 Y:2022 Maintain machines to reduce leaks $705 $1,992
AS0525 #07 Y:2022 Use photocell controls $894 $144
AS0525 #06 Y:2022 Utilize higher efficiency lamps and/or ballasts $6,862 $6,763
AS0525 #05 Y:2022 Apply for investment incentives $17,475 $500
AS0525 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $17,910 $12,950
AS0525 #03 Y:2022 Begin a practice of predictive / preventative maintenance $22,011 $1,900
AS0525 #02 Y:2022 Add air shields to trucks to increase fuel mileage $32,935 $15,560
AS0525 #01 Y:2022 Replace fossil fuel equipment with electrical equipment $66,619 $458,235
LE0525 #06 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $4,480 $20,000
LE0525 #05 Y:2022 Burn wood by-products for heat $41,476 $130,000
LE0525 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $763 $2,001
LE0525 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $108,808 $250,000
LE0525 #02 Y:2022 Eliminate or reduce compressed air usage $6,698 $5,000
LE0525 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $993 $150
MZ0298 #11 Y:2020 Change rate schedules or other changes in utility service $77,234 $900
MZ0298 #10 Y:2020 Maintain air filters by cleaning or replacement $756 $288
MZ0298 #09 Y:2020 Meter recycled water (to reduce sewer charges) $29,362 $25,600
MZ0298 #08 Y:2020 Install occupancy sensors $1,093 $1,639
MZ0298 #07 Y:2020 Utilize higher efficiency lamps and/or ballasts $1,731 $2,790
MZ0298 #06 Y:2020 Install partitions to reduce size of conditioned space $8,154 -