ITAC Assessment: AS0525
ITAC logo
ITAC Assessment: AS0525
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Wood Pallets
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2448: Wood Pallets and Skids
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 871,200
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,652
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,873 1,742,760
kWh
Electricity Demand $33,059 5,540
kW-mo/yr
Electricity Fees $14,207 -
LPG $112,650 4,834
MMBtu
Fuel Oil #1 $222,480 5,696
MMBtu
Waste Disposal Costs
Water Usage $4,457 488
Tgal
TOTAL YEARLY COSTS $551,726
RECOMMENDED SAVINGS* $165,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #1 Savings Water Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $66,619 $458,235 $(-45,139.0)
(-477,157)
kWh
- - $104,258
-
MMBtu
- - - $7,500
02 2.8223: Add air shields to trucks to increase fuel mileage $32,935 $15,560 - - - - $32,935
-
MMBtu
- - -
03 4.611: Begin a practice of predictive / preventative maintenance $22,011 $1,900 $18,978
200,698
kWh
$3,033
-
kW-mo/yr
- - - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,910 $12,950 $16,648
175,978
kWh
$1,262
-
kW-mo/yr
- - - - - -
05 4.812: Apply for investment incentives $17,475 $500 - - $3,495 - - - - $13,980
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,862 $6,763 $5,684
60,081
kWh
$468
-
kW-mo/yr
- - - - $710 -
07 2.7134: Use photocell controls $894 $144 $751
7,934
kWh
$143
-
kW-mo/yr
- - - - - -
08 3.7311: Maintain machines to reduce leaks $705 $1,992 - - - - - $705
-
Tgal
- -
TOTAL RECOMMENDED $165,411 $498,044 $(-3,078.0)
(-32,466)
kWh
$4,906
-
kW-mo/yr
$3,495 $104,258
-
MMBtu
$32,935
-
MMBtu
$705
-
Tgal
$710 $21,480
TOTAL IMPLEMENTED $97,898 $39,665 $41,310
436,757
kWh
$4,763
-
kW-mo/yr
$3,495 - $32,935
-
MMBtu
$705
-
Tgal
$710 $13,980
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #1 Savings Water Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs