ITAC Assessment: LE0525
ITAC logo
ITAC Assessment: LE0525
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Pallets
NAICS 321920: Wood Container and Pallet Manufacturing
SIC 2448: Wood Pallets and Skids
Sales Range $5
M
to 10
M
# of Employees 78
Plant Area 100,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 3,900
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,101 747,177
kWh
Electricity Demand $14,907 3,741
kW-mo/yr
Electricity Fees $7,548 -
LPG $61,031 3,565
MMBtu
TOTAL YEARLY COSTS $129,587
RECOMMENDED SAVINGS* $163,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Increase in Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $993 $150 $830
13,400
kWh
$163
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $6,698 $5,000 $5,592
90,192
kWh
$1,106
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $108,808 $250,000 $6,531
105,331
kWh
$2,277
-
kW-mo/yr
- $100,000
04 2.7142: Utilize higher efficiency lamps and/or ballasts $763 $2,001 $648
10,448
kWh
$115
-
kW-mo/yr
- -
05 3.6123: Burn wood by-products for heat $41,476 $130,000 - - $41,476
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,480 $20,000 $3,457
55,763
kWh
$1,023
-
kW-mo/yr
- -
TOTAL RECOMMENDED $163,218 $407,151 $17,058
275,134
kWh
$4,684
-
kW-mo/yr
$41,476
-
MMBtu
$100,000
TOTAL IMPLEMENTED $1,756 $2,151 $1,478
23,848
kWh
$278
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs