Assessment Year | 2022 |
---|---|
Principal Product | Pallets |
NAICS | 321920: Wood Container and Pallet Manufacturing |
SIC | 2448: Wood Pallets and Skids |
Sales Range | $5 M to 10M |
# of Employees | 78 |
Plant Area |
100,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,101 | 747,177 |
kWh
|
$0.062 |
Electricity Demand | $14,907 | 3,741 |
kW-mo/yr
|
$3.98 |
Electricity Fees | $7,548 | - |
|
- |
LPG | $61,031 | 3,565 |
MMBtu
|
$17.12 |
TOTAL YEARLY COSTS | $129,587 | |||
RECOMMENDED SAVINGS* | $163,218 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $993 | $150 |
$830
13,400
kWh
|
$163
-
kW-mo/yr
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $6,698 | $5,000 |
$5,592
90,192
kWh
|
$1,106
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $108,808 | $250,000 |
$6,531
105,331
kWh
|
$2,277
-
kW-mo/yr
|
- | $100,000 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $763 | $2,001 |
$648
10,448
kWh
|
$115
-
kW-mo/yr
|
- | - | |
05 | 3.6123: Burn wood by-products for heat | $41,476 | $130,000 | - | - |
$41,476
-
MMBtu
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,480 | $20,000 |
$3,457
55,763
kWh
|
$1,023
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $163,218 | $407,151 |
$17,058
275,134
kWh
|
$4,684
-
kW-mo/yr
|
$41,476
-
MMBtu
|
$100,000 | ||
TOTAL IMPLEMENTED | $1,756 | $2,151 |
$1,478
23,848
kWh
|
$278
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs