Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Structural wood members, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0154 #04 Y:1999 Install occupancy sensors $1,042 $600
BD0154 #03 Y:1999 Utilize energy-efficient belts and other improved mechanisms $1,375 $260
BD0154 #02 Y:1999 Recover waste heat from equipment $4,094 $1,000
BD0154 #01 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $5,576 $1,000
DS0151 #03 Y:1999 Apply for investment incentives $709 $400
DS0151 #02 Y:1999 Adopt in-house material generation $8,245 $4,500
DS0151 #01 Y:1999 Change procedures / equipment / operating conditions $4,672 $192
NV0116 #05 Y:1998 Lease / purchase baler; sell cardboard to recycler $175 -
NV0116 #04 Y:1998 Change rate schedules or other changes in utility service $11,871 $50,000
NV0116 #03 Y:1998 Utilize higher efficiency lamps and/or ballasts $2,657 $12,973
NV0116 #02 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $808 $200
NV0116 #01 Y:1998 Reduce the pressure of compressed air to the minimum required $123 -
AR0087 #08 Y:1996 Minimize water usage $3,117 $1,850
AR0087 #07 Y:1996 Reduce illumination to minimum necessary levels $5,359 $3,000
AR0087 #06 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $740 $60
AR0087 #05 Y:1996 Install compressor air intakes in coolest locations $520 $100
AR0087 #04 Y:1996 Utilize energy-efficient belts and other improved mechanisms $1,478 -
AR0087 #03 Y:1996 Use most efficient type of electric motors $3,342 $5,710
AR0087 #02 Y:1996 Reduce illumination to minimum necessary levels $1,624 $10
AR0087 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $524 $124